Last updated November 2, 2026 · Compiled from Amundson Group placement records and public market data.
Hiring for heavy civil, site development, paving, data center, rail, or wastewater work? Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. Send us the role or call (832) 558-7982.
Northern Virginia is still the largest data center market in the world by inventory, and Virginia still has more capacity under construction than any other US market. The binding constraint is power delivery dates from Dominion Energy, and the supervisors who can keep grading, utility and pad work moving while those dates slide. Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work here and across the US.
The pipeline in numbers
- Cushman and Wakefield counts 7,355 MW under construction and 12,338 MW in operation across Virginia in its H1 2026 Americas Data Center Update, published September 14, 2026. No US market on its map has more capacity under construction.
- CBRE, which tracks the colocation market, puts Northern Virginia at 2,420.2 MW under construction (up 16.5% in a year), 4,496.5 MW of inventory and 0.24% vacancy in its H1 2026 report, published August 27, 2026. All capacity delivering in 2026 is already committed, so preleasing has moved into 2027 and beyond.
- JLL puts Northern Virginia inventory at nearly 7 GW with vacancy under 1% (August 11, 2026).
The firms define the market differently, so their totals do not reconcile. Use the Cushman and Wakefield figure for scale and the CBRE figure for the leasing market.
One gauge of labor pressure: Virginia’s 7,355 MW under construction works out to about 1.0 MW for every construction manager the Bureau of Labor Statistics counts in the state (7,290 in May 2025). Of the 12 markets in this series, only West Texas and Reno carry more work per local manager. On that measure the bench is thin relative to the work.
Power sets the schedule
Dominion Energy has about 12,000 MW of data center capacity under contract in its retail service territory and had received about 25,000 MW of large load delivery point requests as of February 2026, with projected connection dates running through December 31, 2031 (WTVR, October 27, 2026). New data center contracts run 14 years, carry minimum demand charges of 85% of contracted capacity for transmission and distribution and 60% for generation, and require collateral of $1.5 million per MW. CBRE adds that Dominion’s batching system is stretching delivery timelines and intensifying competition for entitled sites.
Projects on the ground
- Stafford Technology Campus, Stafford County: Stack Infrastructure plans more than 1 GW across 19 data centers on 500 acres. The first building has topped out after crews logged more than 425,000 hours in just over a year (DCD; CBRE H1 2026).
- Prince William Digital Gateway, near Gainesville: about 2,000 acres planned for 37 data centers and more than 22 million square feet. The Virginia Court of Appeals upheld the ruling that voided the rezonings on March 31; Compass Datacenters said it would not challenge it, and QTS had not said (WTOP, April 2026). That pipeline is stalled.
- Loudoun County: CBRE’s H1 2026 report notes that Amazon Web Services bought 122 acres there for data center development.
Roles builders are hiring for
A campus the size of Stafford is built in phases, which keeps site development and heavy civil crews on the same ground for years: mass grading and rock, stormwater ponds, entrance roads, and building pads that must be ready when a substation date lands. Underground utility work runs alongside it: water, sewer, storm and duct banks. The leadership seats that follow are superintendents who can run several sites at once, project managers who can resequence work around utility dates, safety managers for multi contractor sites, and estimators who can price phased packages.
That is the profile in our open Virginia searches. One superintendent role runs three to four concurrent utility, earthwork and data center jobs within 60 miles of Prince William County, with two crews per site.
Pay: placement medians against the local market
| BLS occupation (May 2025) | Washington metro median | vs US median | Pay Index national median at placement, 12 months to October 2026 |
|---|---|---|---|
| Construction Managers (11-9021) | $129,650 | +12.7% | Project Manager $112,500; Superintendent $112,200 |
| First-Line Supervisors of Construction Trades (47-1011) | $83,540 | +4.5% | Foreman $87,200 |
| Cost Estimators (13-1051) | $89,330 | +13.4% | Estimator $118,750 |
| Occupational Health and Safety Specialists (19-5011) | $109,170 | +21.1% | Safety Manager $100,000 |
The metro is Washington-Arlington-Alexandria, which includes Northern Virginia. Its safety specialist and cost estimator medians are the highest of any metro in this series. Read the columns separately: BLS covers all employed workers, not new hires, while the Construction Placement Pay Index records base salary at the moment of hire, nationally.
Open Amundson Group roles in Virginia
- Superintendent, Virginia, posted October 6, 2026
- Project Manager, Virginia, posted October 8, 2026
- Project Manager, Virginia, $100,000 to $130,000, posted September 11, 2026
- Diesel Mechanic, Virginia, posted September 30, 2026
All four were open on October 29, 2026. Every current search is on our jobs page.
Hiring for a Northern Virginia build?
Send us the role. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis. See how we approach data center construction recruitment.
Sources
- Cushman and Wakefield, Americas Data Center Update H1 2026 (September 14, 2026), market map: cushmanwakefield.com
- CBRE, North America Data Center Trends H1 2026, Northern Virginia chapter: cbre.com
- CBRE press release, August 27, 2026: cbre.com
- JLL, H1 2026 data center press release, August 11, 2026: jll.com
- WTVR, Dominion data center demand, October 27, 2026: wtvr.com
- DCD, Stack tops out first building at Stafford County campus: datacenterdynamics.com
- WTOP, developers drop appeal on Digital Gateway, April 2026: wtop.com
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025, metro and state estimates: metro, state
- Amundson Group Construction Placement Pay Index, October 2026 release: amundsongroup.com
Frequently asked questions
How much data center capacity is under construction in Virginia?
Cushman and Wakefield counts 7,355 MW under construction and 12,338 MW in operation across Virginia in its H1 2026 Americas Data Center Update, more than any other US market on its map. CBRE puts Northern Virginia vacancy at 0.24%.
What do construction managers earn in the Washington metro?
The Bureau of Labor Statistics puts the May 2025 median for construction managers in the Washington-Arlington-Alexandria metro, which includes Northern Virginia, at $129,650, 12.7% above the US median. BLS counts all employed workers, not new hires.
Who recruits for data center construction in Northern Virginia?
Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work in Northern Virginia and across the US. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis.
Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.
More from Amundson Group: data center construction recruiters and construction recruiters in Virginia.
Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.
Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.
Looking for your next role? See open construction jobs.