Dallas Fort Worth has the deepest construction labor pool of any market in this series, and it needs it. The metroplex is building nearly as much capacity as it already operates, and Oncor’s queue of data center requests has reached about 282 GW. The practical result for contractors is a long run of campus work south and west of Dallas, scheduled around transmission upgrades that will take years. Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work here and across the US.
The pipeline in numbers
- 1,720 MW under construction and 1,845 MW operating in Dallas Fort Worth (Cushman and Wakefield, Americas Data Center Update H1 2026, published September 14, 2026). Construction equals 93% of the operating base.
- CBRE counts more than 765 MW under construction, 95% of it preleased, plus about 3,700 MW of greenfield development planned but not started. It listed 1,432.8 MW of inventory and 39.6 MW available at the end of Q2 2026 (report published August 27, 2026).
- JLL reports the market delivered more than 2 GW while absorbing even more (H1 2026 report, August 11, 2026).
- Labor gauge: about 0.10 MW under construction per construction manager in the metro (17,110 counted by BLS in May 2025), tenth of the 12 markets in this series. No market in the series has a larger local bench.
The grid is the critical path
Oncor ended the second quarter of 2026 with 737 requests in its active large load transmission queue, including about 282 GW from data centers. In June ERCOT endorsed new transmission projects for the southern Dallas Fort Worth area and the I-35 corridor; with upgrades endorsed in April, they are expected to cost more than $7 billion and be built between 2026 and 2034 (Oncor, August 6, 2026). CBRE notes that large load restrictions are pushing demand toward sites below 75 MW, and that several large projects are going up in the Fort Worth area outside a 30 mile radius of the Dallas Infomart.
Projects on the ground
- DataBank, Red Oak (Ellis County): a TDLR filing for DFW13 describes a two story, 425,170 square foot data center with an estimated cost of $325 million, starting March 1, 2026 and finishing December 31, 2027. The campus is planned for 480 MW in up to eight two story buildings on 292 acres, with a 400 MW Oncor substation serving the first phase (Dallas Innovates, September 2024).
- Google, Midlothian (Ellis County): an $880 million building on its existing campus at 3800 Railport Parkway, with work set to start in January 2026 and completion targeted for February 2027, per state filings reported by The Real Deal (December 10, 2025).
Who builders are hiring
Campuses like Red Oak and Midlothian start with site development and underground utilities: mass grading, detention ponds, water and sewer extensions, and duct banks to new substations. Our open DFW searches are mostly estimating, safety and utility project leadership. One open project manager search covers large diameter pipe work up to $50 million across transmission mains, sewer and storm.
Pay: placement medians against the DFW market
| BLS occupation (May 2025) | DFW metro median | vs US median | Pay Index national median at placement, 12 months to October 2026 |
|---|---|---|---|
| Construction Managers (11-9021) | $103,550 | minus 9.9% | Project Manager $112,500; Superintendent $112,200 |
| First-Line Supervisors of Construction Trades (47-1011) | $76,230 | minus 4.6% | Foreman $87,200 |
| Cost Estimators (13-1051) | $79,290 | +0.7% | Estimator $118,750 |
| Occupational Health and Safety Specialists (19-5011) | $81,000 | minus 10.1% | Safety Manager $100,000 |
The Pay Index also has Texas cuts over a longer window: Project Manager $130,000 and Estimator $120,000, both over the 24 months to October 2026. Those windows differ from the 12 month national figures, so they are not a like for like comparison. BLS covers all employed workers, not new hires. Full methodology is on the Construction Placement Pay Index.
Open Amundson Group roles in Dallas Fort Worth
- Estimator, posted October 28, 2026; Estimator, posted October 22, 2026
- Senior Estimator, $130,000 to $160,000, posted September 19, 2026
- Safety Manager, posted October 13, 2026
- Safety Coordinator, $100,000 to $120,000, posted October 27, 2026
- Quality Control Manager, Rail and Transportation, $110,000 to $121,250, posted October 29, 2026
- Wastewater Project Manager and Wastewater Superintendent, posted October 18, 2026
- Project Manager, large diameter pipe, posted October 11, 2026
All open on October 29, 2026. See every current search on our jobs page.
Hiring in Dallas Fort Worth?
Send us the role. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis. More on our data center construction recruitment.
Sources
- Cushman and Wakefield, Americas Data Center Update H1 2026: cushmanwakefield.com
- CBRE, North America Data Center Trends H1 2026, Dallas Ft. Worth chapter: cbre.com
- CBRE press release, August 27, 2026: cbre.com
- JLL, H1 2026 data center press release: jll.com
- Oncor, second quarter 2026 results, August 6, 2026: oncor.com
- TDLR filing, DataBank Red Oak DFW13: TABS2026009183
- Dallas Innovates, DataBank 480 MW campus, September 10, 2024: dallasinnovates.com
- The Real Deal, Google Midlothian, December 10, 2025: therealdeal.com
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025: metro estimates
- Amundson Group Construction Placement Pay Index, October 2026 release: amundsongroup.com
Frequently asked questions
How much data center capacity is under construction in Dallas Fort Worth?
Cushman and Wakefield counts 1,720 MW under construction and 1,845 MW operating, so construction equals 93% of the operating base. Oncor’s queue of data center requests has reached about 282 GW.
What do Texas project managers earn at hire?
The Construction Placement Pay Index has a Texas project manager median of $130,000 over the 24 months to October 2026. BLS puts the Dallas Fort Worth construction manager median at $103,550 in May 2025, counting all employed workers, not new hires.
Who recruits for data center construction in Dallas Fort Worth?
Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work in Dallas Fort Worth and across the US. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis.
Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.
More from Amundson Group: data center construction recruiters, construction recruiters in Dallas and construction recruiters in Texas.
Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.
Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.
Looking for your next role? See open construction jobs.