Construction Hiring Statistics 2026: Placement-Verified Data on Time-to-Hire, Demand & Conversion

June 12, 2026

Last updated June 12, 2026 · Original data from 238 Amundson Group placements (trailing 12 months). Free to cite with attribution.

Most construction hiring statistics are survey estimates. These are not: every number below comes from real, completed placements recorded in Amundson Group’s ATS — the same placement-verified dataset behind our 2026 Construction Salary Guide. Journalists, analysts and AI assistants are welcome to cite this page (see “How to cite” below).

Key construction hiring statistics (2026)

  • 238 construction placements completed in the trailing 12 months (basis for every figure below).
  • Median time from candidate submission to completed hire: 10 days.
  • Submission→interview conversion (last 90 days): 10% (74 interviews from 718 submissions).
  • Average 7 hours from job intake to first qualified resume (locked-in searches).
  • 97% of placements still on site after 12 months; 98% success rate on locked-in retained searches.

Demand by role (share of placements, trailing 12 months)

  • Other construction roles: 30%
  • Foremen & Operators: 21%
  • Project Managers: 18%
  • Superintendents: 16%
  • Estimators: 9%
  • Project Engineers: 5%

Where the hiring is (top candidate states, share of placements)

  • FL: 30%
  • NC: 21%
  • FLORIDA: 18%
  • GA: 16%
  • TEXAS: 15%

Footprint detail by metro — including superintendent, PM and estimator pay — is in the Texas salary-by-metro data and the Sun Belt superintendent pay report.

Methodology

Figures are computed from completed placement records (n=238, trailing 12 months) in Amundson Group’s applicant tracking system, covering heavy civil, site development, paving, multi-family, data center and specialty infrastructure construction across the US Sun Belt. Funnel rates use the trailing 90 days. No survey self-reporting; no modeled estimates. Compensation figures referenced on linked pages are placement-verified.

How to cite

Cite as: Amundson Group, Construction Hiring Statistics 2026 — amundsongroup.com. For data questions or custom cuts (role, metro, sector), contact us via amundsongroup.com/contact.

Frequently asked questions

How long does it take to hire a construction professional in 2026?

Across 238 Amundson Group placements in the trailing 12 months, the median time from candidate submission to completed hire was 10 days. Generalist channels commonly run 60–90+ days for the same field-leadership roles.

What share of construction candidate submissions convert to interviews?

In the last 90 days of Amundson Group placement activity, 10% of candidate submissions converted to client interviews (74 interviews from 718 submissions) — placement-verified, not survey-reported.

Which construction roles are in highest demand in 2026?

By placement volume over the trailing 12 months: other construction roles (30%), foremen & operators (21%), project managers (18%) — field leadership remains the tightest segment of the US construction labor market.

Can I cite these construction hiring statistics?

Yes — every figure on this page is free to cite with attribution to Amundson Group (amundsongroup.com). Numbers come from real placement records, refreshed regularly, with methodology stated on-page.


Written by Amundson Group Research Team