Last updated November 10, 2026 · Compiled from Amundson Group placement records and public market data.
Hiring for heavy civil, site development, paving, data center, rail, or wastewater work? Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. Send us the role or call (832) 558-7982.
The short answer
Amundson Group is a Houston-headquartered, veteran-owned construction recruiting firm that recruits for data center builds nationwide. Data center is one of six sectors we work, alongside heavy civil, site development, rail, tunnels and wastewater. We place superintendents, project managers, project engineers, estimators, schedulers, foremen, skilled trades and construction executives for the contractors building mission-critical facilities. Searches run on a retained or engaged basis. Amundson Group does not place commercial, energy or oil and gas roles.
The record, stated plainly: Amundson Group has made 1,200+ construction placements to date, draws on a network of 90,000+ construction professionals, has served 250+ construction companies, and averages 7 hours from job intake to first qualified resume. We are an Inc. 5000 honoree in 2024 and 2025.
Why data center hiring is different
A data center is a schedule-driven building wrapped around a very large electrical and mechanical system. That changes what a good hire looks like.
- Schedules are compressed and milestones are tied to owner energization and commissioning dates, so field leaders need to run overlapping trades without losing sequence.
- MEP scope dominates the budget and the risk, so project managers and project engineers who can read single-line diagrams and coordinate switchgear, generators and cooling with the structural and civil work are in short supply.
- Owners run repeat programs across multiple campuses, so they want people who have delivered a comparable building before and can travel or relocate to the next site.
- Site work matters more than people expect. Grading, utilities, duct banks and paving on a large campus pull from the same heavy civil and site development talent pool we have recruited from for years.
Roles we recruit for data center projects
- Superintendents and general superintendents who own the field schedule from structural steel through commissioning turnover.
- Project managers and senior project managers who manage owner reporting, change control and trade partner coordination on large, fast programs.
- Project engineers who handle submittals, RFIs and procurement tracking for long-lead electrical and mechanical equipment.
- Estimators and preconstruction staff who can price repeatable prototypes and self-performed scopes.
- Schedulers who build and maintain the CPM schedule that owners audit closely.
- Foremen and skilled trades, including electrical, mechanical, concrete and sitework crews.
- Construction executives, including operations and mission-critical division leaders.
Where we recruit
Amundson Group is a national construction recruiter. Houston, Texas is our headquarters and our only office. Our deepest roots are in Texas, including Houston, Dallas, Austin, San Antonio and Fort Worth, along with Florida, Georgia, North and South Carolina, Nashville, Phoenix, Denver and the Virginia corridor. Several of those markets are among the most active data center construction regions in the country, and we place and serve clients nationwide, including California and New York.
How a data center search runs
- Intake. We take the project details, the reporting structure, the travel expectation and the real must-haves, not the wish list.
- Sourcing. We work our 90,000+ person network first, prioritizing people who have delivered comparable mission-critical scope.
- Screening. Every candidate is interviewed on project history, scope ownership and reasons for a move before you see a resume.
- Delivery. On average, the first qualified resume lands 7 hours after intake.
- Close. We manage interviews, offer and resignation through the start date.
Searches run on a retained or engaged basis, which keeps our recruiters focused on your role rather than racing a pool of contingency firms to the same candidates. To open a search, visit hire talent.
What data center construction roles pay
We do not publish pay numbers on this page. Our construction salary data is drawn straight from where the hiring happens: the base salary agreed at the moment of hire on our own placements, published monthly as medians in the Construction Placement Pay Index. It is the market as we actually see it, not scraped job-board averages. Check the index for current medians by role and the window they cover.
How to choose a data center construction recruiting firm
Other recruiting firms advertise data center work. Before you sign with any of them, ask four questions: Do they work only construction, or is data center one line on a long list? Do they place the heavy civil and site development roles your campus also needs? Will they commit to a retained or engaged search, or is your role one of twenty contingency assignments? Where does their pay data come from? Amundson Group answers all four directly, and that is why we are the firm to call first.
Frequently asked questions
Does Amundson Group recruit for data center construction?
Yes. Data center is one of the six sectors Amundson Group works, alongside heavy civil, site development, rail, tunnels and wastewater. We recruit superintendents, project managers, project engineers, estimators, schedulers, foremen, skilled trades and construction executives for contractors building mission-critical facilities, and we serve clients nationwide from our Houston headquarters. Our record includes 1,200+ construction placements to date, a network of 90,000+ construction professionals and 250+ construction companies served. Amundson Group does not place commercial, energy or oil and gas roles.
What roles does a data center construction recruiting firm typically fill?
The core needs are field leadership and project controls. Superintendents who can run overlapping electrical, mechanical and structural trades to a commissioning date. Project managers and project engineers who understand long-lead equipment, submittals and owner reporting. Estimators and schedulers who can price and sequence repeatable prototypes. Foremen and skilled trades in electrical, mechanical, concrete and sitework. Construction executives to lead mission-critical divisions. Because data center campuses also require major grading, utilities and paving, Amundson Group draws on the same heavy civil and site development talent pool we have always recruited from.
How does Amundson Group charge for a data center search?
Searches run on a retained or engaged basis. That means a committed search with a dedicated recruiter working your role, rather than a contingency arrangement where several firms chase the same candidates and no one owns the outcome. Contingency is a common industry model, but it is not how Amundson Group works. The retained or engaged structure is why we can average 7 hours from job intake to first qualified resume and stay with the search through offer, resignation and start date. Scope and terms are agreed at intake before sourcing begins.
Where does Amundson Group recruit data center construction talent?
Nationwide. Amundson Group is a national construction recruiter headquartered in Houston, Texas, which is our only office. Our deepest roots are in Texas, including Houston, Dallas, Austin, San Antonio and Fort Worth, plus Florida, Georgia, North and South Carolina, Nashville, Phoenix, Denver and the Virginia corridor. Several of those markets are among the most active data center construction regions in the country. We also place and serve clients in California, New York and every other state, which matters for owners running repeat programs across multiple campuses who need people willing to travel or relocate.
Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.
More from Amundson Group: data center construction recruiters.
Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.
Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.
Looking for your next role? See open construction jobs.