Last updated November 2, 2026 · Compiled from Amundson Group placement records and public market data.
Hiring for heavy civil, site development, paving, data center, rail, or wastewater work? Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. Send us the role or call (832) 558-7982.
Chicago’s data center market is tight today and building for 2027 and beyond. The next wave is not in the city: it is gigawatt campuses southwest of it, in Morris and Coal City, waiting on ComEd transmission and a state decision on incentives. For contractors, that means large site and utility packages in Grundy County, priced against the flattest field pay ladder in this series. Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work here and across the US.
The pipeline in numbers
- 725 MW under construction and 1,526 MW operating in Chicago (Cushman and Wakefield, Americas Data Center Update H1 2026, published September 14, 2026), twelfth among US markets on its map by capacity under construction.
- CBRE puts vacancy at 2.2%, with 910.6 MW of inventory and 20.0 MW available at the end of Q2 2026. No contiguous block of 5 MW or more will be available this year, and large contiguous projects will deliver in late 2027 at the earliest (H1 2026 report, published August 27, 2026).
- Labor gauge: about 0.05 MW under construction per construction manager in the metro (13,850 counted by BLS in May 2025), eleventh of the 12 markets in this series. The local bench is deep.
Power and policy
ComEd projects it will cost $3.1 billion to connect 30 data centers, $1.6 billion for transmission and $1.5 billion for distribution, or roughly $100 million per data center. Developers have advanced $721 million in deposits, transmission security agreements protect $1.1 billion of the transmission cost, and ComEd reported substantial attrition in its queue after it began requiring those agreements. Some of the 30 are connected; the rest are expected online by 2031 (NPR Illinois, October 26, 2026). On incentives, CBRE reports that Illinois paused its state level data center incentives through the mid November veto session, with applications submitted before July 1, 2026 unaffected.
Projects on the ground
- Tract, Morris Technology Park, Grundy County: 343 acres next to I-80, about 65 miles southwest of downtown, planned for 2.9 million square feet and up to 1 GW. Tract has a transmission security agreement with ComEd, targets initial energization in June 2028 and full load by 2032, and estimates more than 1,000 construction jobs (The Real Deal, January 28, 2026).
- Aligned Data Centers, Coal City: a planned 1 GW campus (CBRE H1 2026).
- Microsoft, Hoffman Estates: leased Compass Datacenters’ campus (CBRE H1 2026).
Who builders are hiring
Morris and Coal City are megasites, so the hiring starts with site development and heavy civil superintendents for mass grading, stormwater and roads, then underground utility leaders for water, sewer and duct banks to new substations. Project managers who can hold a 2028 energization date, estimators who price large civil packages in a high wage market, and safety managers for multi year sites follow. With CBRE showing contiguous space sold out until late 2027, the build schedule, not demand, is the limiting factor.
Pay: a flat ladder in a high wage market
| BLS occupation (May 2025) | Chicago metro median | vs US median | Pay Index national median at placement, 12 months to October 2026 |
|---|---|---|---|
| Construction Managers (11-9021) | $117,280 | +2.0% | Project Manager $112,500; Superintendent $112,200 |
| First-Line Supervisors of Construction Trades (47-1011) | $111,260 | +39.2% | Foreman $87,200 |
| Cost Estimators (13-1051) | $83,640 | +6.2% | Estimator $118,750 |
| Occupational Health and Safety Specialists (19-5011) | $101,630 | +12.7% | Safety Manager $100,000 |
Chicago’s first line supervisors earn about 95% of the construction manager median, the flattest ladder of any metro in this series; elsewhere in the series the figure runs from 64% to 88%. A superintendent offer has to clear a supervisor wage that is already above $110,000 at the median. BLS covers all employed workers, not new hires; the Construction Placement Pay Index reports national base salary at the moment of hire, so compare with care.
Open roles
The Amundson Group job sitemap shows no open roles in Illinois as of October 29, 2026. Current searches are on our jobs page.
Building in the Chicago region?
Send us the role. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis. More on our data center construction recruitment.
Sources
- Cushman and Wakefield, Americas Data Center Update H1 2026: cushmanwakefield.com
- CBRE, North America Data Center Trends H1 2026, Chicago chapter: cbre.com; press release: cbre.com
- NPR Illinois, cost for ComEd to connect data centers, October 26, 2026: nprillinois.org
- The Real Deal, Tract in Morris, January 28, 2026: therealdeal.com
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025: metro estimates
- Amundson Group Construction Placement Pay Index, October 2026 release: amundsongroup.com
Frequently asked questions
How much data center capacity is under construction in Chicago?
Cushman and Wakefield counts 725 MW under construction and 1,526 MW operating in Chicago. CBRE puts vacancy at 2.2%, and large contiguous projects will deliver in late 2027 at the earliest.
Why are Chicago field supervisors expensive to hire?
BLS puts the May 2025 median for first line supervisors of construction trades in the Chicago metro at $111,260, about 95% of the construction manager median of $117,280, the flattest pay ladder in this series. A superintendent offer has to clear that.
Who recruits for data center construction in Chicago?
Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work in Chicago and across the US. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis.
Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.
More from Amundson Group: the data center construction recruiting desk, our Chicago construction recruiting page and our Illinois construction recruiting guide.
Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.
Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.
Looking for your next role? See open construction jobs.