Data Center Construction Recruiters in Austin and San Antonio (2026)

October 13, 2026

Last updated November 2, 2026 · Compiled from Amundson Group placement records and public market data.

Hiring for heavy civil, site development, paving, data center, rail, or wastewater work? Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. Send us the role or call (832) 558-7982.

Austin and San Antonio are reported as one data center market, and the most useful way to read it is through state construction filings and new campus plans. Together they show the build moving past the urban core: west of San Antonio into Medina County, and east of Austin toward Taylor. Capacity under construction now exceeds what the market has in operation. Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work here and across the US.

The pipeline in numbers

  • 1,438 MW under construction against 1,210 MW operating in Austin and San Antonio (Cushman and Wakefield, Americas Data Center Update H1 2026, published September 14, 2026). It is one of four markets in this series, with West Texas, Reno and Iowa, where construction matches or exceeds the operating base.
  • JLL reports the market completed 1.7 GW and absorbed 796 MW as development extended beyond the urban core (H1 2026 report, August 11, 2026).
  • Labor gauge: about 0.13 MW under construction per construction manager across the two metros (10,720 counted by BLS in May 2025), ninth of the 12 markets in this series.

None of the H1 2026 reports we reviewed publishes a vacancy rate for this market.

What the state filings show

Accessibility filings with the Texas Department of Licensing and Regulation (TDLR) list dates and estimated costs that press releases leave out.

  • Microsoft, Castroville, Medina County: two “SAT82” filings, a 244,676 square foot building at $482.6 million (start April 11, 2026, finish February 8, 2028) and a 195,670 square foot building at $400 million (start August 13, 2026, finish July 24, 2028), about $883 million combined. A third filing, SAT93, covers a new greenfield site with a planned March 2027 start.
  • Vantage Data Centers, TX12, west San Antonio: a two story, 432,800 square foot building for up to 96 MW of critical IT at $276.9 million (October 2025 to August 2027), plus a $448 million fit out of 96 MW of data modules (August 2026 to March 2028), about $725 million together.
  • Amazon Data Services, Lavender Hill, Bexar County: a two story, 93,145 square foot data center at $65 million, starting November 20, 2026.
  • Sabey Data Centers, Round Rock: a $40 million, 77,000 square foot data hall scheduled for completion in September 2026.

The next wave is bigger. Big Watt Digital and PowerHouse Data Centers plan the Taylor Technology Campus on about 664 acres east of Taylor, up to 1 GW at full build out, with construction from 2027 to 2029 and initial power in the first half of 2028 (CommercialSearch, October 12, 2026).

Power timing

New large loads in ERCOT are moving through its Batch Zero study. Financial security of $50,000 per MW was due July 10, 2026; study results are expected April 9, 2027 and interconnection agreements June 8, 2027 (POWER, August 4, 2026). For campuses not yet energized, those are the dates to plan around.

Who builders are hiring

Castroville and Taylor are edge of metro sites, so the first seats are site development and heavy civil superintendents, underground utility leaders for water, sewer and duct bank runs, and project managers and estimators who can carry phased packages. Our open Austin searches fit that profile: a divisional superintendent to run an underground utilities division with four to six concurrent projects, a P6 scheduler for TxDOT heavy civil work, and a project manager for $8 million to $50 million roadway and infrastructure jobs.

Pay: two metros, both below the national line

BLS occupation (May 2025) Austin median San Antonio median Pay Index national median at placement, 12 months to October 2026
Construction Managers $102,980 (minus 10.4% vs US) $98,450 (minus 14.4%) Project Manager $112,500; Superintendent $112,200
First-Line Supervisors of Construction Trades $77,800 (minus 2.7%) $73,520 (minus 8.0%) Foreman $87,200
Cost Estimators $78,650 (minus 0.1%) $74,830 (minus 5.0%) Estimator $118,750
Occupational Health and Safety Specialists $80,730 (minus 10.4%) $77,690 (minus 13.8%) Safety Manager $100,000

San Antonio’s construction manager median is the lowest of any large metro in this series. BLS covers all employed workers, not new hires, so local medians are not offer benchmarks. The Construction Placement Pay Index tracks what placements closed at, including Texas cuts over 24 months.

Open Amundson Group roles in the Austin area

All three were open on October 29, 2026; we have no open San Antonio role today. Texas and national searches are on our jobs page.

Building along I-35?

Send us the role. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis. More on our data center construction recruitment.

Sources

Frequently asked questions

How much data center capacity is under construction in Austin and San Antonio?

Cushman and Wakefield counts 1,438 MW under construction against 1,210 MW operating in the combined Austin and San Antonio market, so construction now exceeds the operating base.

What do construction managers earn in Austin and San Antonio?

BLS puts the May 2025 construction manager median at $102,980 in Austin and $98,450 in San Antonio, 10.4% and 14.4% below the US median. BLS counts all employed workers, not new hires.

Who recruits for data center construction in Austin and San Antonio?

Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work in Austin and San Antonio and across the US. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis.

Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.


Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.

Hire Talent

Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.

Looking for your next role? See open construction jobs.



Alex Mowbray

Written by Alex Mowbray

Founder and Executive Chairman of Amundson Group

View full bio