In Atlanta, the story is the gap between announcements and local approval. CBRE ranks it North America’s most active construction market for the first time, Georgia regulators have approved a near 10 GW generation build to serve the load, and yet metro governments are starting to pause new data center requests. For contractors, the work is real, but it is moving south of the city and into South Georgia, to the counties still saying yes. Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work here and across the US.

The pipeline in numbers

  • CBRE counts 2,882 MW under construction in Atlanta, up 52.3% in a year, against 1,803.2 MW of inventory with 29.5 MW available at the end of Q2 2026 (H1 2026 report, published August 27, 2026).
  • Cushman and Wakefield counts 1,715 MW under construction and 1,880 MW operating (H1 2026, published September 14, 2026), fifth among US markets on its map. The two firms define the market differently, so the totals do not reconcile.
  • JLL reports record absorption of 918 MW in six months (August 11, 2026).
  • CBRE says turnkey space is preleasing about 12 months before completion and build to suit projects about 2.5 years before.
  • Labor gauge: 0.23 MW under construction per construction manager in the metro on the Cushman and Wakefield figure, or 0.39 MW on CBRE’s (7,470 managers counted by BLS in May 2025). That is sixth of the 12 markets in this series either way.

Power is approved; permission is not

On December 19, 2025 the Georgia Public Service Commission voted 5 to 0 to approve about 9,885 MW of new Georgia Power generation, largely to meet data center demand, resolving projected needs through 2031 (FOX 5 Atlanta). CBRE adds that entitlement and power delivery remain hard in Georgia and that electric membership cooperatives are partnering with third party generators to offer more flexible in-service dates. The local side is tightening: Hampton in Henry County adopted moratoriums in February 2026, and other metro governments are questioning how many data centers are too many (Atlanta Journal-Constitution, March 6, 2026).

Projects on the ground

  • Project Sail, Coweta County: Prologis has the site under contract for up to 4.3 million square feet in nine buildings on 829 acres, about $17 billion, needing roughly 900 MW. County commissioners approved the rezoning 3 to 2 in April 2026 (The Real Deal, April 10, 2026).
  • Hampton, Henry County: an Equinix campus is partially built with four buildings planned, and a 604 acre, 4 million square foot technology park was proposed in February 2026 (AJC).

Who builders are hiring

South metro campuses on rural acreage mean site development first: mass grading, erosion control under Georgia’s certification rules, stormwater ponds, and long water, sewer and duct bank runs. The seats that follow are superintendents, project managers, estimators and safety managers. That matches our open Georgia list, which includes a superintendent search for a data center project in Augusta at $130,000 to $150,000.

Pay: Atlanta placements against the local market

The Construction Placement Pay Index has Atlanta metro cuts, all over the 24 months to October 2026: Foreman $93,000, Superintendent $114,220 and Project Manager $115,000. National medians over the 12 months to October 2026 are a different window: Foreman $87,200, Superintendent $112,200, Project Manager $112,500, Estimator $118,750 and Safety Manager $100,000.

BLS occupation (May 2025) Atlanta metro median vs US median Atlanta Pay Index cut, 24 months to October 2026
Construction Managers (11-9021) $119,590 +4.0% Superintendent $114,220; Project Manager $115,000
First-Line Supervisors of Construction Trades (47-1011) $80,500 +0.7% Foreman $93,000
Cost Estimators (13-1051) $82,870 +5.2% No Atlanta cut
Occupational Health and Safety Specialists (19-5011) $91,620 +1.6% No Atlanta cut

BLS covers all employed workers, not new hires, so the BLS column shows the market’s middle, not what an offer has to beat.

Open Amundson Group roles in Georgia

These are 8 of 36 open Georgia roles on October 29, 2026. The rest are on our jobs page.

Building in metro Atlanta?

Send us the role. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis. More on our data center construction recruitment.

Sources

  • CBRE, North America Data Center Trends H1 2026, Atlanta chapter: cbre.com; overview: cbre.com
  • CBRE press release, August 27, 2026: cbre.com
  • Cushman and Wakefield, Americas Data Center Update H1 2026: cushmanwakefield.com
  • JLL, H1 2026 data center press release: jll.com
  • FOX 5 Atlanta, PSC approves Georgia Power expansion, December 19, 2025: fox5atlanta.com
  • The Real Deal, Project Sail approval, April 10, 2026: therealdeal.com
  • Atlanta Journal-Constitution, March 6, 2026: ajc.com
  • U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025: metro estimates
  • Amundson Group Construction Placement Pay Index, October 2026 release: amundsongroup.com

Frequently asked questions

How much data center capacity is under construction in Atlanta?

CBRE counts 2,882 MW under construction in Atlanta, up 52.3% in a year. Cushman and Wakefield counts 1,715 MW under construction and 1,880 MW operating. The two firms define the market differently, so the totals do not reconcile.

What do Atlanta superintendents earn at hire?

The Construction Placement Pay Index has an Atlanta superintendent median of $114,220 over the 24 months to October 2026, and a project manager median of $115,000. BLS puts the Atlanta construction manager median at $119,590 in May 2025, counting all employed workers.

Who recruits for data center construction in Atlanta?

Amundson Group recruits superintendents, project managers and safety managers for data center site, civil and utility work in Atlanta and across the US. First qualified resumes arrive in 7 hours on average. Searches run on a retained or engaged basis.

Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.


Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.

Hire Talent

Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.

Looking for your next role? See open construction jobs.



Alex Mowbray

Written by Alex Mowbray

Founder and Executive Chairman of Amundson Group

View full bio