Last updated November 2, 2026 · Compiled from Amundson Group placement records and public market data.
Hiring for heavy civil, site development, paving, data center, rail, or wastewater work? Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. Send us the role or call (832) 558-7982.
A director of preconstruction decides which Miami-Dade jobs a contractor pursues and how they are priced and planned before anything is signed: go or no-go calls, conceptual and detailed estimates, schedules, constructability reviews, risk registers, and the proposals and interviews that win design-build work. For a firm in our lines of work, those pursuits run from FDOT District Six roadway and bridge projects to county water and sewer programs, transit corridors and site and utility packages, nearly all of them shaped by groundwater, buried utilities and traffic that never stops. Below are the federal pay figures, what is heading to market in Miami-Dade, and how Amundson Group fills the seat.
Director of Preconstruction pay in Miami: what the data shows
Amundson Group’s Construction Placement Pay Index, October 2026 release, does not publish a median for directors of preconstruction. In the Miami-Fort Lauderdale metro area, construction managers, the closest federal occupation for this role, earned a median of $126,110 in May 2025 and one in ten earned more than $214,820, according to the U.S. Bureau of Labor Statistics, which counts all employed workers, not only new hires.
Sources: Amundson Group Construction Placement Pay Index, October 2026 release; U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025.
Neither of those numbers is what a Miami director of preconstruction is paid. The Pay Index, built from Amundson Group placements in heavy civil, site development, paving, data center, rail, tunnel, wastewater and underground utility work, publishes a role only once it has enough placements in the window, and this role has not reached that count. BLS publishes no occupation for preconstruction leaders, so its figure stands in with construction managers, a group that spans every level of seniority and every industry across the Miami-Fort Lauderdale metro, counted as all employed workers in May 2025. A director with a record of winning design-build pursuits often sits above that median, so a Miami offer is settled in the search, case by case.
What is driving director of preconstruction demand in Miami
- FDOT District Six construction coming up. The district’s September 2025 briefing listed Miami-Dade projects with construction funded in the next few years: a $59 million flexible pavement reconstruction of SR 907/Alton Road in fiscal 2027, a $60.8 million bridge replacement on SR 934/NE 79th Street and a $29.5 million job to add lanes and rehabilitate pavement on SR 860/Miami Gardens Drive, both in fiscal 2029 (FDOT District Six).
- Design-build risk on I-395. FDOT’s I-395, SR 836 and I-95 design-build project, home of the Signature Bridge, saw its projected cost climb from $818 million to $866 million and its finish slip from 2027 to late 2029, the kind of exposure a preconstruction team has to weigh before it signs a design-build price (Miami Today).
- Commuter rail in design. The Northeast Corridor, which FDOT lists among the county-led SMART corridors in design, now has $389 million in federal money set aside and a $337.9 million Miami-Dade pledge, though the mayor’s office says the proposed agreement with the private rail operator on the line does not yet meet its standard (FDOT District Six; WLRN).
What a Director of Preconstruction runs on Miami-Dade pursuits
The director decides where the pursuit team spends its hours. For FDOT District Six work that starts with the work program and the district’s design-build advertisements months before a letting, matching each project to the company’s crews, equipment and bonding, and choosing the few worth chasing. On a design-build or adjusted score pursuit, the director assembles the design partner and the team, sets the technical approach, runs the constructability and risk sessions and owns the price and schedule the proposal commits to.
Miami-Dade pursuits carry risks that have to be priced before the company is bound: dewatering permits and the treatment of pumped groundwater, utility conflicts in old corridors, maintenance of traffic on roads that are busy day and night, storm season inside a long schedule and escalation over years of work. On county water and sewer bids the director also weighs shutdown windows at live plants and the cost of bypass pumping. At award, operations receives an estimate, a baseline schedule and a written list of every risk the price carries.
We screen Miami preconstruction leaders on what they have led and how they think: which FDOT, county or private pursuits they ran, how many they won and why they lost the others, how their estimates held up against final cost, and how they decided when to walk away from a job.
How Amundson Group recruits a Director of Preconstruction in Miami
Amundson Group is a veteran-owned firm that recruits only in construction, from 1336 Brittmoore Rd in Houston, with 1,200+ construction placements to date and 90,000+ construction professionals in its network. Before the search starts we confirm the pursuits on your calendar, the delivery methods you bid, the estimators and schedulers the director will lead, who signs off on price, the start date and the base salary range.
Expect first qualified resumes in 7 hours on average and a shortlist in 7 days. Searches run on a retained or engaged basis. Tell us about your Miami preconstruction opening or call (832) 558-7982.
Frequently asked questions
How much does a Director of Preconstruction earn in Miami?
Amundson Group’s Construction Placement Pay Index, October 2026 release, has no median for directors of preconstruction, in Miami or nationally. Construction managers, the nearest federal occupation, earned a median of $126,110 in the Miami-Fort Lauderdale metro in May 2025, and one in ten earned more than $214,820, according to the U.S. Bureau of Labor Statistics, which counts all employed workers. A Miami director’s offer is settled during the search.
What will Miami preconstruction teams be pricing over the next few years?
FDOT District Six work such as the $59 million SR 907/Alton Road reconstruction funded in fiscal 2027 and the $60.8 million NE 79th Street bridge replacement in fiscal 2029, county water and sewer programs, and the Northeast Corridor commuter line, which is in design.
Why does design-build experience matter for a Miami director?
Because design-build moves design risk onto the contractor. On FDOT’s I-395, SR 836 and I-95 design-build project the projected cost rose from $818 million to $866 million and the finish moved to late 2029, so a director has to price design and schedule risk before the proposal goes in.
How quickly can Amundson Group send preconstruction candidates in Miami?
On average you see first qualified resumes within 7 hours and a shortlist within 7 days. Searches run on a retained or engaged basis.
Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.
More from Amundson Group: construction recruiters in Miami and construction recruiters in Florida.
Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.
Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.
Looking for your next role? See open construction jobs.