Last updated November 2, 2026 · Compiled from Amundson Group placement records and public market data.
Hiring for heavy civil, site development, paving, data center, rail, or wastewater work? Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. Send us the role or call (832) 558-7982.
A director of preconstruction decides which Las Vegas work a contractor pursues and how it is priced long before crews mobilize. The seat follows the Southern Nevada Water Authority’s construction manager at risk opportunities, tracks flood control projects from design to advertisement, sits in constructability reviews with design engineers and owns the cost model behind every guaranteed maximum price. In a market built on storm drains and channels, water transmission and pumping stations, street rebuilds and site work for industrial and data center campuses, preconstruction sets the shape of the whole pipeline. This page covers pay data for the role, what is coming to market in Las Vegas and how Amundson Group fills it.
Director of Preconstruction pay in Las Vegas: what the data shows
Amundson Group’s Construction Placement Pay Index, October 2026 release, does not publish a median for directors of preconstruction. In the Las Vegas metro area, construction managers, the closest federal occupation for this role, earned a median of $112,570 in May 2025 and one in ten earned more than $172,870, according to the U.S. Bureau of Labor Statistics, which counts all employed workers, not only new hires.
Sources: Amundson Group Construction Placement Pay Index, October 2026 release; U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025.
These numbers need a careful reading. Amundson Group’s index does not report directors of preconstruction, since no role appears until it has enough placements in the window. The federal median is for construction managers, the closest occupation the Bureau of Labor Statistics publishes, and it covers every person in that occupation employed in the Las Vegas metro, whatever they build and however senior, so it is not a salary for this role. Preconstruction leaders frequently earn above that median, and Amundson Group prices each offer inside the search, one company and one candidate at a time.
What is driving Director of Preconstruction demand in Las Vegas
- A pumping station priced under CMAR. The Southern Nevada Water Authority finished design of its Stage II transmission pipeline and the 90-million-gallon-a-day Monthill Pumping Station and opened final pricing and contract negotiations with its construction manager at risk; the Stage 2 reliability project is estimated at $418 million, with pumping station completion expected in October 2029 (Southern Nevada Water Authority).
- Cities can advertise before district money arrives. Under the flood control district’s Entity Advance Funding policy, a city or Clark County can advance its own construction funding to advertise and award a contract ahead of the district’s schedule, within a $40 million cap and only for projects programmed in the first three years of the ten-year program (Regional Flood Control District).
- Big drains in design for fiscal 2028. Two box storm drain systems now in design have construction funding programmed for fiscal 2028: about $40.5 million for channel and box drain in Windmill Lane and Las Vegas Boulevard, part of the Duck Creek and Blue Diamond system, and about $30.5 million for Brent Lane and El Capitan Way in the northwest valley. The district escalates construction costs 2.6% for fiscal 2027 and 2.0% a year from fiscal 2029 onward (Regional Flood Control District).
What a Director of Preconstruction runs on Las Vegas water and flood control work
On construction manager at risk work, preconstruction starts long before a price. The director staffs the design-phase reviews, checks quantities and constructability at each design milestone, builds an open-book estimate the owner can audit, and negotiates the guaranteed maximum price with its contingency and allowances. Pumping stations bring pumps, motors, valves and electrical gear with long lead times, so procurement timing and escalation terms belong in the number.
Flood control and street contracts work differently, because most are advertised by a city or Clark County and won on price. The director decides which of those jobs fit the company’s crews, sets the bid strategy and makes sure estimators treat traffic control, utility conflicts and dewatering the same way on every bid. After award, the job passes to the project manager and superintendent with the estimate, schedule assumptions and risk log intact.
We ask preconstruction candidates for the largest guaranteed maximum price they negotiated, the owners they served in design-phase work, their win rate on hard bids and how close their estimates landed to final cost. We also ask how they trained estimators, since a director’s team does most of the pricing.
How Amundson Group recruits a Director of Preconstruction for Las Vegas
Construction is the only industry Amundson Group recruits for: the firm is veteran owned, headquartered in Houston, and has 1,200+ construction placements to date with a network of 90,000+ construction professionals. Our intake for a preconstruction search covers the delivery methods you pursue, the owners you price for, the size of the estimating team the director will lead and how the seat is paid. You receive first qualified resumes in 7 hours on average and a shortlist in 7 days. Searches run on a retained or engaged basis.
The director a Las Vegas contractor needs has priced water authority and flood control work and can hold their ground with an owner during a price negotiation. Open a preconstruction search or call (832) 558-7982.
Frequently asked questions
What is the pay for a construction Director of Preconstruction in Las Vegas?
The October 2026 Pay Index does not publish this role. In the Las Vegas metro, construction managers, the nearest federal occupation, had a May 2025 median of $112,570 and a top tenth above $172,870, according to the U.S. Bureau of Labor Statistics across all employed workers, not only new hires.
Which Las Vegas owner is using construction manager at risk delivery?
The Southern Nevada Water Authority. Its fiscal 2027 budget reports ozone equipment upgrades being performed under construction manager at risk, and final pricing under way with its CMAR contractor on the $418 million Stage 2 reliability project.
Can a city start a flood control project before district funds are available?
Yes. Under the district’s Entity Advance Funding policy the city or county advances construction funding, advertises and awards the contract, and is reimbursed later, within a $40 million cap and only for projects programmed in the first three years.
How fast can Amundson Group deliver preconstruction candidates in Las Vegas?
First qualified resumes arrive in 7 hours on average after intake, and a shortlist in 7 days. Searches run on a retained or engaged basis.
Start a search with Amundson Group. Average 7 hours from job intake to first qualified resume.
More from Amundson Group: our Las Vegas construction recruiting page and our Nevada construction recruiting guide.
Need this hire made? Send us the role. Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.
Prefer to talk? Call (832) 558-7982 or use the full form at amundsongroup.com/hire-talent.
Looking for your next role? See open construction jobs.