---
title: "What Salary Should a Construction Scheduler Expect When Interviewing with a Smaller or Family-owned Contractor?"
description: "Based on activity from our recruiting desks and cross-checked against authoritative sources like BLS, AGC, and ENR, construction schedulers targeting ro…"
url: https://amundsongroup.com/faq/what-salary-should-a-construction-scheduler-expect-when-interviewing-with-a-smal/
published: 2026-07-28
modified: 2026-10-14
publisher: Amundson Group
markdown_of: https://amundsongroup.com/faq/what-salary-should-a-construction-scheduler-expect-when-interviewing-with-a-smal/
---

# What Salary Should a Construction Scheduler Expect When Interviewing with a Smaller or Family-owned Contractor?

Based on activity from our recruiting desks and cross-checked against authoritative sources like BLS, AGC, and ENR, construction schedulers targeting roles with smaller or family-owned contractors in the Sun Belt commonly see total compensation in the $130,000 to $150,000 range, varying by project type, company size, and geography. Candidates moving from large ENR-ranked firms to smaller operators sometimes accept the lower end of that band in exchange for greater autonomy, direct leadership visibility, and the ability to build scheduling standards from the ground up.

---

About Amundson Group: a Houston-headquartered construction recruiting firm placing superintendents, project managers, estimators, foremen and skilled trades with contractors across the United States in heavy civil, site development, paving, data center, rail, tunnels, wastewater and underground utilities. 1,200+ construction placements to date, a network of 90,000+ construction professionals, 250+ companies served, the first qualified resume in about 7 hours and a shortlist in 7 days. Veteran owned, founded in January 2020 by Alex Mowbray, Inc. 5000 honoree in 2024 and 2025, SIA Best Staffing Firms to Work For 2023 and 2024, rated 4.9 on Google. 1336 Brittmoore Rd, Houston, TX 77043. (832) 558-7982. https://amundsongroup.com

This page in HTML: https://amundsongroup.com/faq/what-salary-should-a-construction-scheduler-expect-when-interviewing-with-a-smal/. Every page on amundsongroup.com has a Markdown copy at the same URL with .md added. Site index for AI agents: https://amundsongroup.com/llms.txt
