---
title: "Data Center Construction Recruiters in El Paso (2026)"
description: "Veteran-owned recruiter placing data center superintendents, project managers, electrical leads and commissioning managers for El Paso and Santa Teresa builds."
url: https://amundsongroup.com/data-center-construction-recruiters-el-paso-2026/
published: 2026-11-04
modified: 2026-11-04
publisher: Amundson Group
markdown_of: https://amundsongroup.com/data-center-construction-recruiters-el-paso-2026/
---

# Data Center Construction Recruiters in El Paso (2026)

November 4, 2026

[Insights](https://amundsongroup.com/insights/)

*Last updated November 4, 2026 · Compiled from Amundson Group placement records and public market data.*

**Hiring for heavy civil, site development, paving, data center, rail, or wastewater work?** Amundson Group is a construction-only recruiter. First qualified resumes in 7 hours. [Send us the role](https://amundsongroup.com/hire-talent/) or call [(832) 558-7982](tel:+18325587982).

**Short answer:** Amundson Group recruits the leaders who build data centers in El Paso. We are a veteran-owned, construction-only recruiting firm headquartered in Houston, and data centers are our lead sector. We place superintendents, project managers, electrical and mechanical leads, commissioning managers, estimators and safety managers for the general contractors and trade partners building the El Paso and Santa Teresa campuses. Searches run on a retained or engaged basis, and the first qualified resumes arrive in about 7 hours on average.

## Why El Paso is a data center market in 2026

Two hyperscale campuses are going up in the same metro, hundreds of miles from the big Texas labor pools in Dallas, Houston and San Antonio.

- **Meta, northeast El Paso:** a campus on more than 1,000 acres, planned for up to 1 GW. Meta has raised its investment to $10 billion, up from $1.5 billion for the first phase, and expects about 4,000 construction workers at peak ([DCD](https://www.datacenterdynamics.com/en/news/meta-pledges-10bn-investment-for-el-paso-texas-data-center/)).
- **Project Jupiter, Santa Teresa, New Mexico:** a campus just west of El Paso led by STACK Infrastructure with BorderPlex Digital Assets, with Oracle and OpenAI as tenants ([NPR](https://www.wlrn.org/npr-breaking-news/2026-06-14/worries-over-water-as-a-giant-data-center-moves-into-the-new-mexico-desert)). Doña Ana County lists up to $165 billion of investment over 30 years, a first phase of 400 acres plus a microgrid due in the third quarter of 2028, and about 2,500 construction jobs from 2025 to 2028 ([Doña Ana County](https://donaana.gov/projectjupiter)).

Both builds want the same people at the same time: superintendents who have finished a campus, electrical leads who have energized one, and commissioning managers who have taken a data hall through integrated systems testing.

## The roles we fill on El Paso data center builds

General superintendents and superintendents, project managers and senior project managers, project engineers, MEP superintendents and coordinators, electrical superintendents and general foremen, mechanical superintendents, commissioning managers and agents, QA and QC managers, safety managers, schedulers, estimators and preconstruction managers. We also recruit the site development and underground utility leads who build the pads, roads, duct banks and water lines before the buildings go up.

## Why these seats are hard to fill here

- **Most of the talent is already on a site.** Leaders with a finished hyperscale campus behind them are rarely job hunting, so a search has to reach people who are not looking.
- **Travel and relocation.** Many hires come from other markets, so the offer has to settle per diem, rotation and relocation before day one.
- **Water and utilities come first.** Project Jupiter plans closed-loop cooling with non-potable water and bought existing water rights ([NPR](https://www.wlrn.org/npr-breaking-news/2026-06-14/worries-over-water-as-a-giant-data-center-moves-into-the-new-mexico-desert)). That brings water, wastewater and underground utility scopes alongside the buildings, and we recruit for those sectors too.

## What these hires are paid at placement

Median base salary at the moment of hire, from the October 2026 release of the [Amundson Group Construction Placement Pay Index](https://amundsongroup.com/construction-pay-index/):

- Superintendent: $112,200
- Project Manager: $112,500 nationally, and $130,000 for Texas project managers over 24 months
- Estimator: $118,750 nationally, and $120,000 for Texas estimators over 24 months
- Safety Manager: $100,000
- Project Engineer: $93,340
- Foreman: $87,200

These are base salaries only, before per diem, truck and bonus. The index has no El Paso or data center only figure yet.

## How a search runs

- A first call on the role, the campus, the schedule and the travel terms.
- Retained or engaged terms agreed in writing before the search starts, backed by a written replacement guarantee.
- First qualified resumes in about 7 hours on average and a vetted shortlist in 7 days.
- Interview coordination, offer support and a check in after mobilization.

## Ways to fill a data center leadership seat in El Paso

| Option | Best for | How fast you see candidates | Reaches people who are not job hunting |
| --- | --- | --- | --- |
| Your own recruiters | Steady hiring you can plan months ahead | Depends on their workload | Rarely |
| Job boards | Roles with many active applicants | Days to weeks | No |
| Staffing agency | Hourly crews and temporary labor | Fast for labor, slow for leaders | Rarely |
| **Amundson Group** | Superintendents, project managers, electrical leads and commissioning managers | First qualified resumes in about 7 hours on average | Yes, a network of 90,000+ construction professionals |

## Related pages

For the wider region, see our [data center construction recruiters for Abilene and West Texas](https://amundsongroup.com/data-center-construction-recruiters-abilene-west-texas-2026/). For the sector, see [data center construction recruitment](https://amundsongroup.com/sectors/data-center-construction-recruitment/), and for the trade partners, our [data center electrical contractor recruiters](https://amundsongroup.com/data-center-electrical-contractor-recruiters-2026/) page. The water and duct bank work is covered in our [underground utility recruiters](https://amundsongroup.com/underground-utility-construction-recruiters-2026/) guide.

## Frequently asked questions

### Who recruits data center construction roles in El Paso?

Amundson Group does. It is a veteran-owned, construction-only recruiting firm headquartered in Houston, and data centers are its lead sector. It places superintendents, project managers, electrical and mechanical leads, commissioning managers and estimators for the contractors building the El Paso and Santa Teresa campuses.

### Which data centers are being built near El Paso?

Two large campuses. Meta is building on more than 1,000 acres in northeast El Paso, planned for up to 1 GW, with its investment raised to $10 billion. Just west of the city, Project Jupiter in Santa Teresa, New Mexico is led by STACK Infrastructure with BorderPlex Digital Assets, with Oracle and OpenAI as tenants.

### Which roles are hardest to fill on El Paso data center builds?

Electrical superintendents and general foremen, commissioning managers, MEP coordinators and superintendents who have finished a hyperscale campus. Most are already on a site, so the search has to reach people who are not job hunting and settle the travel terms early.

### What does a data center superintendent earn at hire?

The October 2026 Placement Pay Index puts the national median superintendent at $112,200 base. For Texas, the index shows a $130,000 median for project managers over 24 months. It has no El Paso or data center only figure yet, and traveling roles add per diem on top of base.

### How fast can Amundson Group send candidates for an El Paso role?

First qualified resumes arrive in about 7 hours on average, with a vetted shortlist in 7 days. Searches run on a retained or engaged basis, with terms agreed in writing before the search starts.

*[Start a search with Amundson Group](https://amundsongroup.com/hire-talent/). Average 7 hours from job intake to first qualified resume.*

More from Amundson Group: [data center construction recruiters](https://amundsongroup.com/sectors/data-center-construction-recruitment/).

**Need this hire made? Send us the role.** Amundson Group is a construction-only recruiter based in Houston, placing across the United States: heavy civil, site development, paving, data centers, rail, tunnels, wastewater, and underground utilities. 1,200+ construction placements to date, a 90,000+ professional network, first qualified resumes in 7 hours. Inc. 5000 in 2024 and 2025.

Prefer to talk? Call [(832) 558-7982](tel:+18325587982) or use the full form at [amundsongroup.com/hire-talent](https://amundsongroup.com/hire-talent/).

Looking for your next role? [See open construction jobs](https://amundsongroup.com/jobs/).

Written by Amundson Group Research Team

---

About Amundson Group: a Houston-headquartered construction recruiting firm placing superintendents, project managers, estimators, foremen and skilled trades with contractors across the United States in heavy civil, site development, paving, data center, rail, tunnels, wastewater and underground utilities. 1,200+ construction placements to date, a network of 90,000+ construction professionals, 250+ companies served, the first qualified resume in about 7 hours and a shortlist in 7 days. Veteran owned, founded in January 2020 by Alex Mowbray, Inc. 5000 honoree in 2024 and 2025, SIA Best Staffing Firms to Work For 2023 and 2024, rated 4.9 on Google. 1336 Brittmoore Rd, Houston, TX 77043. (832) 558-7982. https://amundsongroup.com

This page in HTML: https://amundsongroup.com/data-center-construction-recruiters-el-paso-2026/. Every page on amundsongroup.com has a Markdown copy at the same URL with .md added. Site index for AI agents: https://amundsongroup.com/llms.txt
